• Latest
  • Trending
FG: CCECC Takes Over Construction of Carter Bridge

FG: CCECC Takes Over Construction of Carter Bridge

May 7, 2026
Senate receives Tinubu’s letter seeking to confirm new service chiefs

Senate Amends Rules for electing Presiding, Principal Officers

May 7, 2026
Oyebanji Rallies Support for Tinubu at SWAGA 2.0 Launch

Oyebanji Rallies Support for Tinubu at SWAGA 2.0 Launch

May 7, 2026
JAPA: FG says ‘no more leave of absence’ for health workers

Academic Fraud: FG Bans Honorary Degree Holders from ‘Dr’ Title

May 7, 2026
Lagos Govt To Close Eko Bridge For Repairs

FG Shuts Eko Bridge Carriageway

May 7, 2026
Sylva Clinches APC Governorship Ticket in Bayelsa

Court Grants EfCC Interim Forfeiture of Sylva Properties

May 7, 2026
https://www.firstbanknigeria.com/personal/loans/mreif-home-loan/
ADVERTISEMENT
Akpabio, Oshiomhole Clash Over Senate Rules

Akpabio, Oshiomhole Clash Over Senate Rules

May 6, 2026
Tinubu Directs Service Chiefs to Move to Borno

APC Waives Screening, Clears Tinubu for Presidential Primaries

May 6, 2026
Senate Confirms Tegbe, Enikanolaye as Ministers

Senate Confirms Tegbe, Enikanolaye as Ministers

May 6, 2026
Ekiti EXCO Donates N100m to Back Oyebanji’s Re-election Bid

Ekiti EXCO Donates N100m to Back Oyebanji’s Re-election Bid

May 6, 2026
ADVERTISEMENT
  • About US
  • Advert Rates
  • Privacy Policy
  • Contact
Thursday, May 7, 2026
  • Login
No Result
View All Result
Present Nigeria
  • Home
  • News
    • Education
    • Health
    • Crime
  • Business
  • Politics
  • Entertainment
    • Lifestyle
  • Opinion
  • Sports
  • World News
  • Home
  • News
    • Education
    • Health
    • Crime
  • Business
  • Politics
  • Entertainment
    • Lifestyle
  • Opinion
  • Sports
  • World News
No Result
View All Result
Present Nigeria
No Result
View All Result

FG: CCECC Takes Over Construction of Carter Bridge

by Present Nigeria
May 7, 2026
in News
0
FG: CCECC Takes Over Construction of Carter Bridge
27
SHARES
53
VIEWS
FacebookTwitterWhatsappTelegram

The Federal Government has officially handed over the construction of a brand-new Carter Bridge in Lagos to China Civil Engineering Construction Corporation (CCECC) as part of President Bola Tinubu’s commitment to protecting critical infrastructure and ensuring the safety of Nigerians.

The event took place at Carter Bridge, Lagos Island, Lagos State, on Wednesday.

RelatedPosts

Senate Amends Rules for electing Presiding, Principal Officers

Oyebanji Rallies Support for Tinubu at SWAGA 2.0 Launch

Academic Fraud: FG Bans Honorary Degree Holders from ‘Dr’ Title

In his address at the handover, the Minister of Works, David Umahi, said the decision to reconstruct the bridge became necessary after years of alarming structural investigations revealed worsening defects beneath both the Carter Bridge and the 3rd Mainland Bridge.

Umahi said investigations into the underwater structural elements of the bridges began as far back as 2013, with another assessment carried out in 2019.

The reports, he said, showed that the defects were increasing at what experts described as “geometrical progression”.

“The past administration commissioned an investigation of what was happening with the structural elements below the water, and that was in 2013. And the very disturbing defects were noticed in Carter Bridge and 3rd Mainland Bridge,” Umahi’s aide, Francis Nwaze, quoted the minister as saying in a statement.

He explained that upon assumption of office, the present administration immediately engaged geologists and specialist divers to conduct further underwater investigations, which confirmed that some piles supporting the bridges had already shifted from their pile caps.

“It’s just like the hip of the leg is cut off,” the minister explained while describing the severity of the damage.

The former governor of Ebonyi State said extensive consultations were held with bridge experts, stakeholders, and members of the National Assembly, including foreign professionals, to determine the best solution.

According to him, repairing the Carter Bridge would cost almost twice the amount required to build a completely new structure.

Umahi said that part of the new Carter Bridge will feature a world-class cable-stayed design to improve navigation and add aesthetic value to Lagos.

“We decided that a section of this Carter Bridge will be a cable bridge. You see the cable bridge we see overseas, very beautiful, and that is to enhance our navigational activities,” he said.

The minister disclosed that the project is expected to last 36 months. He praised Tinubu for what he described as bold leadership and commitment to infrastructure renewal across the country.

The minister stated that due process was strictly followed in selecting the contractor, noting that seven firms were invited while six submitted bids, including Julius Berger.

“The CECC was technically and commercially most viable. And that’s why the BPP recommended them, and the Federal Executive Council has awarded the project to them,” he said.

He directed the company to immediately mobilise to the site while assuring Nigerians that the ministry would closely monitor the project monthly to ensure compliance with all technical and safety standards.

The project, valued at ₦545 billion, will be financed through a combination of Federal Government counterpart funding and external borrowing, with 30 per cent to be paid by the Federal Government and 70 per cent sourced externally.

Share this:

  • Click to share on Facebook (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Pinterest (Opens in new window)

Related

Share11Tweet7SendShareShare2
Previous Post

Academic Fraud: FG Bans Honorary Degree Holders from ‘Dr’ Title

Next Post

Oyebanji Rallies Support for Tinubu at SWAGA 2.0 Launch

Related Posts

Senate receives Tinubu’s letter seeking to confirm new service chiefs

Senate Amends Rules for electing Presiding, Principal Officers

May 7, 2026
JAPA: FG says ‘no more leave of absence’ for health workers

Academic Fraud: FG Bans Honorary Degree Holders from ‘Dr’ Title

May 7, 2026
Lagos Govt To Close Eko Bridge For Repairs

FG Shuts Eko Bridge Carriageway

May 7, 2026
Sylva Clinches APC Governorship Ticket in Bayelsa

Court Grants EfCC Interim Forfeiture of Sylva Properties

May 7, 2026
Next Post
Oyebanji Rallies Support for Tinubu at SWAGA 2.0 Launch

Oyebanji Rallies Support for Tinubu at SWAGA 2.0 Launch

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

PRESENT, a credible online newspaper from the cell of Red Carpet Communications Limited, is published by an experienced and profoundly resourceful journalist, Yemi Olowolabi.
It leads in lucid presentation of trending stories and breaking news in Politics, Business, Economy, Entertainment, Sports, Lifestyles and Other Features.
With a heritage of in-depth coverage and adept leverage of core professionals, PRESENT is the trusted witness of the news.

  • Privacy Policy
  • Contact Us
  • Advert Rates

© 2025 Present Nigeria. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
    • Education
    • Health
    • Crime
  • Business
  • Politics
  • Entertainment
    • Lifestyle
  • Opinion
  • Sports
  • World News

© 2025 Present Nigeria. All Rights Reserved.