• Latest
  • Trending
“There is no opposition party in Ebonyi, Only APC exists- Umahi

Tinubu developing every part of the country with fairness, equity- Umahi replies to Kwankwaso

July 26, 2025
Gov Mutfwang suspends mining activities in Plateau

Plateau Govt Relaxes Curfew in Jos North

April 8, 2026
Ogun 2027: ‘I  remain Committed to serving with integrity’- Obasanjo

Ogun 2027: ‘I remain Committed to serving with integrity’- Obasanjo

April 8, 2026
WHO Congratulates Nigeria On Wild Polio Free Status

WHO updates Guidelines for treatment of Opioid dependence, Overdose mgt

April 8, 2026
#EndSARS: UN Condemns Shooting , Calls For End To Police Brutality

Attacks on Iran’s Civilian Infrastructure would violate Int’l law- UN Chief warns

April 8, 2026
CVR: Skillfully concocted fabrication, APC denies ADC rigging allegations

Heaven Will Not Fall If ADC, Other Political Parties are not on the Ballot—Lagos APC

April 8, 2026
https://www.firstbanknigeria.com/personal/loans/mreif-home-loan/
ADVERTISEMENT
Kebbi Govt Gov approves 6 months maternity leave for workers

2027: Gov Idris Pledges Electoral Victory for Tinubu

April 8, 2026
54 Students Missing As Gunmen Invade Secondary School

Bandits kill Police officer, two Others in Katsina

April 8, 2026
Enugu Govt Seals Schools, Hotels, Firms For Tax Evasion

Lagos move to recover outstanding tax, arraigns defaulters

April 8, 2026
Troops dismantles 18 illegal refining sites, demobilised 10 boats

Troops foil cross-border fuel smuggling, arrest16 suspected terrorists

April 8, 2026
ADVERTISEMENT
  • About US
  • Advert Rates
  • Privacy Policy
  • Contact
Wednesday, April 8, 2026
  • Login
No Result
View All Result
Present Nigeria
  • Home
  • News
    • Education
    • Health
    • Crime
  • Business
  • Politics
  • Entertainment
    • Lifestyle
  • Opinion
  • Sports
  • World News
  • Home
  • News
    • Education
    • Health
    • Crime
  • Business
  • Politics
  • Entertainment
    • Lifestyle
  • Opinion
  • Sports
  • World News
No Result
View All Result
Present Nigeria
No Result
View All Result

Tinubu developing every part of the country with fairness, equity- Umahi replies to Kwankwaso

by Present Nigeria
July 26, 2025
in News
0
“There is no opposition party in Ebonyi, Only APC exists- Umahi
30
SHARES
60
VIEWS
FacebookTwitterWhatsappTelegram

The Minister of works, David Umahi has responded to the allegations made by Rabiu Kwankwaso that the North is marginalized on road infrastructure by the administration of President Bola Tinubu.

Umahi in a statement on Friday said statement is absolutely false, misleading and self-serving adding that the President as favour the north in road development more than the south.

RelatedPosts

Plateau Govt Relaxes Curfew in Jos North

Ogun 2027: ‘I remain Committed to serving with integrity’- Obasanjo

WHO updates Guidelines for treatment of Opioid dependence, Overdose mgt

“My attention as Honourable Minister of Works has been drawn to the unfortunate statement by His Excellency, Sen. Kwankwaso that President Bola Ahmed Tinubu, GCFR, is developing more roads in the South than in the North.

I consider this statement as a grave misleading information made intentionally to deceive our brothers and sisters in the North and to pretend that he loves the North more than any other leader from the North. I consider Sen. Kwankwaso’s statement as statement made out of desperation and as part of his struggle with few others who believe that they can inherit the impeccable legacy of our dear late President Mohammadu Buhari, GCFR and that the only way available for them towards achieving same is to be divisive and pretentious. Trying to be like our late President Buhari cannot be a job of three decades and can not be done with deceit. I think our younger generation has such a chance and which must be worked for through hard work, honesty, transparency and commitment to the unity of our country , a legacy that our late President Buhari, GCFR achieved in all his life on earth. May God continue to bless his legacies and give him a peaceful rest, Amen

For the interest of all Nigerians, especially our dear brothers and sisters in the North, I wish to highlight just a few key ongoing projects in each of the six Geo-Political Zones.

The four legacy projects of President Bola Ahmed Tinubu, GCFR:
a) Lagos-Calabar Coastal Highway, which is 750 km: As of today, a total of 110 km is ongoing within Lagos State and 65 km within Cross River and Akwa Ibom States. The total ongoing is 175 km by 6 lanes or 350 km by 3 lanes in the South.
b) The Sokoto-Badagry Superhighway, which is 1068km: As of today, we have 258 km ongoing at Kebbi section and 120 km ongoing at Sokoto section. Total ongoing is 378 km by 6 lanes or 756 km by 3 lanes in the North.
c) Trans Sahara road spanning through Cross River – Ebonyi – Benue – Kogi – Nasarawa – Abuja, which is 465km: 118 km by 3 lanes or 59 km by 6 lanes is ongoing in Ebonyi State – South.
d) Akwanga – Jos – Bauchi – Gombe road, which is 439km: Project is being redesigned from flexible pavement to rigid pavement for more durable pavement as directed by Mr. President and to conform to the other legacy projects. In the four legacy projects, the North has 52% and South 48%. Within the ongoing projects as of today, the South has 409 km by 3lanes and the North has 756km by 3 lanes .

“The facts are there. I wonder why people don’t talk about other legacy projects of Mr. President but will always dwell on Lagos-Calabar Coastal Highway.

“This road has only 220 km by 3 lanes in Lagos State that is ongoing now , crossriver and Akwaibom has 130km by 3 lanes that is ongoing whereas kebbi alone has 316 km by 3 lanes that is ongoing. Sokoto has 240 km by 3 lanes that is ongoing . I think Sen. Kwankwaso is not fair to Mr.President and the unity of our country.

The following major projects are also ongoing in the North.
a) Sokoto – Zamfara – Katsina – Kaduna road: This is 275 km dualized (750 km), costing about ₦824 Billion. This project is being handled by CBC, Triacta, Setraco, and Mothercat. Projects are ongoing mostly on reinforced concrete pavement. Despite the insecurity within this corridor, work is ongoing.
b) Abuja – Kaduna – Kano road: 350 km dualized (700km) project is being constructed on concrete pavement with a total sum of ₦764 Billion with Infiouest Nig Ltd and 30% of the contract sum already paid and work is ongoing.
c) BUA Tax Credit road passing through Jigawa, Katsina, and Kano States: 256 km dualized (512 km). Project redesigned and constructed on rigid pavement.
d) 156 km of Zaria – Hunkuyi road is being constructed by mothercat Nig Ltd.
e) The Kano Northern Bypass: 49 km is being constructed by CCECC.
f) The 100.9 km dualized (201.8 km) Kano – Jigawa road is being constructed by Triacta.
g) The Bama and Dikwa roads (49+51= 100 km) by Dangote Tax Credit are ongoing in Borno State
h) The Borno Ring Road: 110 km is being constructed by CCECC.
i) The 76 km Malando road in Kebbi State is being constructed by Episolyn Nig Ltd.
j) The 250 km dualized (500 km) Benue to 9th Mile road costing $958 Million by China Harbour is ongoing.
k) The dualization of Lokoja – Okene 86km dualized (172km) by CGC is ongoing.
l) The sections 1 and 2 of Kaduna to Katsina roads by CCECC costing about ₦150 Billion is ongoing.

Major ongoing projects in the South:
a) Completion of Lagos – Ibadan 8.5 km costing ₦33 Billion by RCC.
b) completion of Lagos to Sagamu 12 km dualized (24 km) and flyovers by CBC costing
c) completion of Oyo – Ogbomoso to Ilorin Road costing ₦146 Billion by JRB
d) Repairs of Carter bridge, Third Mainland bridge, Eko bridge with total contract sum of about ₦120 Billion

e) In South East, we have:
i. Completion of Enugu – Onitsha road by MTN tax credit which is 107 km costing ₦202 Billion.
ii. Completion of Enugu – Onitsha road by CBC, which is 72 km costing ₦150 Billion.

iii. Enugu – Abakaliki 36 km road by reinforced global resources
iv) 2nd Niger bridge access road in Anambra State, 17.5 km dualized with many bridges and flyovers – ₦175Billion by CGC Vii ) the completion of 61km dualized of lokpanta in Imo state to Enugu state by CGC costing 100bn

f.) In South – South:
i. Completion of Eleme – Onne road project, which is 30 km with bridges and flyovers costing ₦156 Billion.
ii. Eket bypass road of 9.7 km dualized costing ₦76 Billion
iii. Completion of East West Road section 2 which is ₦186 Billion by Setraco
iv. Nembe Brass road costing ₦150 Billion.
v) completion of Lokoja to Benin road by four contractors costing about ₦167 Billion
vi) 2nd Niger bridge access road in Delta 17 km dualized by CCECC costing ₦146 Billion.
Vii) completion of Bodo Bonny Road in Rivers State 35 km with 12 bridges by Julius Berger Nig Plc, costing 200bn

“I have a duty in the coming week to publish all inherited projects and new projects that are either completed or ongoing in this present administration .

” I can say with all sense of responsibility that President Tinubu is a fair President. He has favoured the North in road development more than the South, especially North West, where Sen. Kwankwaso comes from.

” Apart from these four legacy projects, 80% of the above named ongoing projects were projects awarded by the past administration towards the end of that administration in 2023 but never took off effectively which President Tinubu decided to continue to fund towards completion.

” If he had abandoned them, same people will complain. I have been under pressure by some stakeholders for the construction of their major roads like the abandoned Ibadan – Oyo by Arab contractor , Ibadan – Ife – Ilesa, Ilesa – Akure – Benin and Ore – Sagamu road.

“I have been badly accused that I am only doing projects in the North, especially North West. Third Mainland bridge is being closed down to heavy trucks because of underwater structural defects.

“The Carter bridge is so deformed that it needs to be removed and reconstructed. These are the real major projects in South West which I have been appealing to Mr President to give me money to do those projects because the people of South West may think that I am doing nothing about the major projects in their zone.

“These projects are projects that are within major economic corridor between the South and the North and deserve attention. Again, these bridges, if allowed to further deteriorate, will lead to serious economic consequences for the nation.

“Mr President is not only fair in the completion of major inherited projects/ new projects, but they are all within the major economic corridor of our nation. I will publish all ongoing projects which are above 20 billion naira each next week .

“We still have many projects within the six geopolitical zones that are not listed here . In this circumstance, I don’t know where Sen Kwankwaso got his misinformation from.

“It is unfortunate that the utterances of some of our political leaders are just intended to deceive Nigerians and gain political favour instead of making statements that will unite the country and move her forward

“I will offer more explanation on this topic, and am ready to face a debate with anyone just to put the records straight.

Let me say that in the ongoing NNPCL Tax Credit roads and bridges as inherited, the North has 53% while the South has 47% out of which South East has only 4% and South West only 5%. The records are there with NNPCL . Mr. President did not complain about the unfair distribution of these inherited projects by the past administration but has continued to fund all the projects as inherited.

To my brother Senator Kwankwaso, you owe our President, Tinubu, an apology and a duty to withdraw your statement using the information I have provided herein for the benefit of Nigerians and the unity of the nation.

” I request the good people of Nigeria to ignore Senator Kwakwanso’s misleading statement and know that President Tinubu is fairly committed to developing every part of this country with fairness, equity and the fear of God”

Share this:

  • Click to share on Facebook (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Pinterest (Opens in new window)

Related

Share12Tweet8SendShareShare2
Previous Post

Presidency replies Kwankwaso on Tinubu leaving North behind, lists ongoing projects

Next Post

Eko DisCo announces 25-day blackout in Lagos

Related Posts

Gov Mutfwang suspends mining activities in Plateau

Plateau Govt Relaxes Curfew in Jos North

April 8, 2026
WHO Congratulates Nigeria On Wild Polio Free Status

WHO updates Guidelines for treatment of Opioid dependence, Overdose mgt

April 8, 2026
#EndSARS: UN Condemns Shooting , Calls For End To Police Brutality

Attacks on Iran’s Civilian Infrastructure would violate Int’l law- UN Chief warns

April 8, 2026
54 Students Missing As Gunmen Invade Secondary School

Bandits kill Police officer, two Others in Katsina

April 8, 2026
Next Post
Vandalism Cost Us  N4b In Assets – EKEDC

Eko DisCo announces 25-day blackout in Lagos

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

PRESENT, a credible online newspaper from the cell of Red Carpet Communications Limited, is published by an experienced and profoundly resourceful journalist, Yemi Olowolabi.
It leads in lucid presentation of trending stories and breaking news in Politics, Business, Economy, Entertainment, Sports, Lifestyles and Other Features.
With a heritage of in-depth coverage and adept leverage of core professionals, PRESENT is the trusted witness of the news.

  • Privacy Policy
  • Contact Us
  • Advert Rates

© 2025 Present Nigeria. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
    • Education
    • Health
    • Crime
  • Business
  • Politics
  • Entertainment
    • Lifestyle
  • Opinion
  • Sports
  • World News

© 2025 Present Nigeria. All Rights Reserved.