• Latest
  • Trending
LASTMA Announces Closure Of Third Mainland Bridge On Sunday

FG Begins Rehabilitation Of Third Mainland Bridge Nov. 1

October 30, 2023
Sanwo-Olu Instals Alara of Ilara as 6th LASU chancellor

Sanwo-Olu Instals Alara of Ilara as 6th LASU chancellor

April 9, 2026
F.G Releases N13.89b Pension Funds For MDAs

Pension Records N1.39tr increase as Assets rise to N29.43tr

April 9, 2026
Ganduje’s Fmr Aide, Yakasai Defects to ADC

ADC Appoints Ogbu as Chairman Congress Appeal Committee

April 9, 2026
2027: Onireti Appointed DG City Boy Movement in Oyo

2027: Onireti Appointed DG City Boy Movement in Oyo

April 9, 2026
PPMC fixes petrol ex-depot price at N138.62 per litre

Dangote Refinery reduces petrol price to N1,200/litre

April 8, 2026
https://www.firstbanknigeria.com/personal/loans/mreif-home-loan/
ADVERTISEMENT
Trafficking: Court Orders Sealing Of 4 Brothels in Port Harcourt

Court Remands Housewife for Allegedly killing her 3-day-old Stepson

April 8, 2026
EFCC Arrests One for Naira Mutilation in Maiduguri

EFCC Arrests One for Naira Mutilation in Maiduguri

April 8, 2026

Iran Confirms two-week ceasefire

April 8, 2026
Trump Reacts To Acquittal, Lauds Legal Team For Upholding Justice

Ceasefire deal: Trump Agrees To Suspend Bombing Of Iran For Two Weeks

April 8, 2026
ADVERTISEMENT
  • About US
  • Advert Rates
  • Privacy Policy
  • Contact
Thursday, April 9, 2026
  • Login
No Result
View All Result
Present Nigeria
  • Home
  • News
    • Education
    • Health
    • Crime
  • Business
  • Politics
  • Entertainment
    • Lifestyle
  • Opinion
  • Sports
  • World News
  • Home
  • News
    • Education
    • Health
    • Crime
  • Business
  • Politics
  • Entertainment
    • Lifestyle
  • Opinion
  • Sports
  • World News
No Result
View All Result
Present Nigeria
No Result
View All Result

FG Begins Rehabilitation Of Third Mainland Bridge Nov. 1

by Present Nigeria
October 30, 2023
in News
0
LASTMA Announces Closure Of Third Mainland Bridge On Sunday
27
SHARES
54
VIEWS
FacebookTwitterWhatsappTelegram

The Minister of Works, Mr David Umahi, on Saturday said comprehensive rehabilitation of the 11.8-kilometer Third Mainland Bridge in Lagos would begin on Nov. 1 for a period of three months.

Umahi said this during an inspection of the under deck, lagoon sections of the Third Mainland Bridge and other bridges.

RelatedPosts

Sanwo-Olu Instals Alara of Ilara as 6th LASU chancellor

Pension Records N1.39tr increase as Assets rise to N29.43tr

ADC Appoints Ogbu as Chairman Congress Appeal Committee

Umahi, a team of engineers, directors of the Federal Ministry of Works and journalists inspected the lagoon sections of the Third Mainland, Carter, Independence and Falomo Bridges.

Umahi also inspected the deteriorating Marina shoreline, the failing portions of the Five Cowries Bridge located inside Zone Two Police Headquarters in Onikan, Ijora Bridge and Marina Bridge in Apapa.

He said the entire stretch of the Third Mainland Bridge would undergo total resurfacing with minimal discomfort to road users, and the repairs would be carried out by midnight during the weekend.

He said he carried out inspection of the top surface of the bridge on Friday before embarking on inspection of the Lagoon portions.

The minister explained that patching of various sections of the top surface of bridge had led to undulating surfacing, which was not healthy for its safety, hence the need to remove and relay the entire asphaltic covering.

“We are going to mill out the excess asphalt and retain only two millimetres,” he said.

The minister said the proposed maintenance of Third Mainland Bridge, which would last three months was the first phase meant to secure the integrity as well aesthetics of the upper deck components of the bridge.

He explained that the maintenance of the aesthetics would include replacement of the railings, installation of solar-powered lights and CCTV cameras for optimal security of the bridge.

The minister assured that the three-month maintenance work would be without discomfort to motorists, as it would take place only between midnight and 4.00 a.m. and during weekends.

He added that more than one contractor would be engaged due to the emergency nature of the work, which would end in Phase Four; that will entail the repairs of deflected slabs, bearings, piers and pile caps.

The minister lamented that most of the bridges were about 60 years old and had outlived thier design lifespan, hence the need for constant rehabilitation.

Umahi, who is a civil engineer, said the Marina Shoreline had deteriorated and was threatening the foundation of some parts of the Blue Rail Line, hence the need for urgent protection which had begun.

“Marina shoreline is gone,” he said.

The minister warned that henceforth a 10-year maintenance responsibility would be attached to projects for contractors to bear repair costs within the period if the road failed.

He added that contractors who constructed roads that failed within two years risked jail term in line with global practices to curb shoddy constructions.

Recall that the Third Mainland Bridge was earlier closed for 24 hours repairs from midnight on Oct. 21 to midnight Oct. 22 for emergency resurfacing of some bad portions. (NAN)

Share this:

  • Click to share on Facebook (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Pinterest (Opens in new window)

Related

Share11Tweet7SendShareShare2
Previous Post

Mohbad’s Death Was Planned By His Wife- Kemi Olunloyo Alleges

Next Post

Police Arrest Medical Doctor With Three Abducted Children in Rivers

Related Posts

Sanwo-Olu Instals Alara of Ilara as 6th LASU chancellor

Sanwo-Olu Instals Alara of Ilara as 6th LASU chancellor

April 9, 2026
Trafficking: Court Orders Sealing Of 4 Brothels in Port Harcourt

Court Remands Housewife for Allegedly killing her 3-day-old Stepson

April 8, 2026
EFCC Arrests One for Naira Mutilation in Maiduguri

EFCC Arrests One for Naira Mutilation in Maiduguri

April 8, 2026

Iran Confirms two-week ceasefire

April 8, 2026
Next Post
Church Thief Electrocuted In Aba

Police Arrest Medical Doctor With Three Abducted Children in Rivers

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

PRESENT, a credible online newspaper from the cell of Red Carpet Communications Limited, is published by an experienced and profoundly resourceful journalist, Yemi Olowolabi.
It leads in lucid presentation of trending stories and breaking news in Politics, Business, Economy, Entertainment, Sports, Lifestyles and Other Features.
With a heritage of in-depth coverage and adept leverage of core professionals, PRESENT is the trusted witness of the news.

  • Privacy Policy
  • Contact Us
  • Advert Rates

© 2025 Present Nigeria. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
    • Education
    • Health
    • Crime
  • Business
  • Politics
  • Entertainment
    • Lifestyle
  • Opinion
  • Sports
  • World News

© 2025 Present Nigeria. All Rights Reserved.